MAINTAINING WORKS

×

Error message

The file could not be created.

I. OUR MAINTENANCE SERVICE Building a project to ensure technical quality, art and safety in the process of use is not a small investment, maintenance to keep your house in a stable state and maintain beauty of that work is even more important. Early degradation of construction works is mainly due to lack of maintenance. In parallel with the repair, upgrading of works, maintenance becomes an integral part of the construction and management of buildings and
Ensuring the life of the building has become an important content of asset management strategies in many countries around the world. Manage this type of asset as a maintenance and maintenance mode to satisfy users' needs.
Today, the advanced countries in the world all agree that the strategy of managing this type of asset must be established on the basis of long-term quality assurance through technical and legal measures throughout the phases from prepare investment, carry out investment and exploitation in order to ensure and maintain the normal and safe work of the project in accordance with the design in the process of exploitation and use. This strategy is expressed in detail through the maintenance of construction works.
Understanding the concerns of customers, Singcons, please provide construction maintenance services to customers with the desire to support customers with professional facilities and care. Remove worries and save repair costs for you later.
With a staff of professionally trained, reliable professional ethics, we are always ready to serve and satisfy customers. Building maintenance service of Singcons is divided into two sections:
Equipment maintenance (Maintenance of electromechanical systems) + Water supply (MEP)
Construction maintenance (including construction interior and exterior)
Details of the content to be performed in our service include:
A) Maintenance of construction part:
1) Water paint, glass change, miles, patch, leak proof, ...
2) Handling waterproofing: roofs, floors, masonry walls, basement walls, water tanks, ...
3) Interior and exterior: Cabinets, tables, chairs, beds, reception desks (only repair not including new ones); Doors, blinds, rolling doors, glass doors, decal stickers; Advertising panel.
B) Refrigeration and mechanical systems - Water supply and drainage (MEP)
1) Electrical system maintenance: electrical cabinets, wires, ...
2) Refrigeration and ventilation maintenance: Chiller maintenance, air conditioner 2, air conditioner, air conditioner, air conditioner, wall fan, stand fan, electric fan, all kinds of pipelines wind,…
3) Maintenance of fire protection system: maintenance of fire-fighting water supply tank, fire-fighting water pump, fire-fighting water pipe, smoke alarm system, heat alarm system, nozzle system, ...;
4) Maintenance of water supply system including supply water tank, clean water supply pipeline, water tank on roof, all kinds of faucets, sinks;
5) Maintenance of drainage systems including water drainage pipes, wastewater treatment tanks, sanitary equipment systems in toilets, ...
6) Maintenance of wastewater treatment systems;
7) Elevator maintenance: maintenance & repair of elevators and escalators of all kinds;
8) Maintenance of generators;
9) Maintenance of lightning protection system: maintenance of lightning collecting system, resistance test, lightning receiver line maintenance, ...
C. Other:
1) Treat insects, resist termites;
2) Fire and explosion insurance;
3) Venting septic tanks;
4) Furniture: furniture, plaster, wallpaper, ...
Photos of our staff's maintenance work:

I. MAINTENANCE PROCESS OF PROJECT
1. Make a list of machinery, equipment and maintenance needs:
A project when put into operation often has many machines and equipment. Therefore, making the list of existing assets, machinery and equipment of the project is necessary to help the maintenance and maintenance of works be tight and quick when incidents occur. This list must be updated regularly by the technical department when adding new equipment for the project.
2. Survey of the current status of works:
The technical department will conduct a survey of all types of assets, machinery and equipment based on the machines being used, depending on the features and functions of the specialized equipment, in order to determine the frequency of security. maintenance, machine maintenance. In addition, it helps to identify the maintenance capacity, which is internal or external maintenance.

3. Plan maintenance maintenance:
After surveying the current situation, the Technical Department plans maintenance and maintenance based on the list of machinery and equipment and directly survey the status of all kinds of machinery and equipment. Maintenance planning also identifies the amount of work, material costs and the number of employees.
4. Prepare maintenance maintenance:
Based on the established maintenance plan, the Maintenance Department will make recommendations on the types of equipment and materials that need to be used for planned maintenance and carry out the purchase process. For maintenance types that need to hire maintenance services outside, the Maintenance Department is responsible for finding suppliers, subcontractors, evaluating quality prices and signing contracts and tracking jobs. Follow the process to make sure maintenance takes place

5. Perform maintenance maintenance:
After the preparation stages have been completed, the Maintenance Department can proceed with the plan. It is necessary to understand the maintenance and maintenance time and the acceptance and acceptance of the acceptance and maintenance minutes and not affect the work of the whole building. According to the approved maintenance and maintenance plan, the technical staff conducts self-maintenance or invites the outsourced maintenance unit to maintain. The assigned people must prepare necessary supplies and spare parts corresponding to the plan of maintenance, repair and maintenance. Maintenance personnel must directly monitor and supervise the maintenance process, after completing the maintenance, they must make written records on acceptance and maintenance.
6. Updating management of construction maintenance records:

 After repairs are completed, the Maintenance Team Leader is responsible for collecting and managing maintenance records including: Updating the information on the periodic monitoring card. Save the acceptance test records. This is one of the essential steps required for proper maintenance and maintenance process. In order to choose a management unit with a lot of experience in this field, investors should consult from people around or on websites. Should choose units with many years of experience and high expertise to help the building work stably.
With a staff of experienced, well-trained, we will bring to investors the maintenance services for the best works.

 

English

VỀ CÔNG TY

Singcons không chỉ là một trong những nhà thầu xây dựng chuyên nghiệp trong ngành xây dựng mà còn là một Công ty đầu tư trực tiếp vào nhiều ngành nghề, nhiều lĩnh vực song hành với các hoạt động thiết kế, quy hoạch kiến trúc, đô thị hóa nông thôn, đầu tư khách sạn, nhà hàng, resort, kinh doanh bất động sản và tư vấn quản lý dự án.

OFFICE OF THE COMPANY

 
4-4B Le Quy Don St, 6 Ward , 3 Dist, HCMC
 
02873065668
 
FAX: 

WORKING TIME

 

  • Monday - Friday: 8:00 am to 5:30 pm
  • Saturday: 8:00 am to 12:00 noon